Preparation of detailed project report for proposed construction of high level bridge across THENPENNAIYAR river in LIEU of existing causesway at KM Ghat 72/0 – 72/6 of Cuddalore – Chithoor Road (SH-9).

Client : Highways Department, Govt. of Tamilnadu.

 

Detailed Engineering Projects

(Design & Construction)

1. Client : Ashoka Buildcon Limited, Nashik, Maharashtra

Detailed Design, Drawings and Contract management Consultancy of “Rehabilitation /Upgradation of existing Highway to 2 Lane /4 lane with paved shoulder configuration from Jalgaon – Pachora – Bhadgaon (Design Ch. 4+000 to Ch 56+200) section of NH-753J (Jalgaon – Manmad) on EPC Mode in the state of Maharashtra” &

Detailed Design, Drawings and Contract management Consultancy of “Rehabilitation /Upgradation of existing Highway to 2 Lane /4 lane with paved shoulder configuration from Bhadgaon to Chalisgaon (Design Ch 56+200 to Ch 103+000) section of NH-753J (Jalgaon – Manmad) on EPC Mode in the state of Maharashtra”.

2. Client : DP Jain & Co. Infrastructure Pvt. Ltd, Nagpur

 Detailed Design Consultancy Services for Four laning of Nagpur – Umred Section from km 7+300 to Km 48+400 (Package I) of NH-353D in the state of Maharashtra on EPC Basis Contract.

3. Client : Sunrise Constructions – Engineers and Contractors, Ramtek, Maharashtra

Consultancy Services for Detailed Design including Surveys for “ 1) Construction of PUP at Km 685.820 including Service Road in forest Section on Jabalpur – Nagpur Section of NH44 and

2) Construction of FOB and Bus shelters between km 652.000 and km 692.000 in forest section of NH44 of Jabalpur – Nagpur Section.